More News

ADOT Pavement Project Between Globe and San Carlos; Reduced Speeds and Lane Closures

A pavement maintenance project will be starting Monday, Sept. 9 on US 70 between Globe and the San Carlos Apache Reservation.

The project will start in Globe (milepost 252) and will continue eight miles towards the San Carlos Apache Reservation (milepost 260). Work will be done overnight from 9 p.m. to 6 a.m. Monday through Friday, Sept. 12.  Drivers should expect narrowed traffic lanes and a reduced speed limit with flaggers present to guide vehicles through the work zone where needed.

ADOT advises drivers to proceed through the work zones with caution, slow down, and be alert for construction equipment and personnel.

For more information about this project, please contact the project hotline 1.855.712.8530 or email Projects@azdot.gov.